Services

Installation:

  • floor3.jpgCustom design or standard installation, strip, plank, or parquet, new or reclaimed.
  • All our materials are National Oak Flooring Manufacturing Certified.
  • Our Oak Flooring is Plastic wrapped to insure dryness and original quality on each and every board.
  • Most installation jobs take 1-2 days.
  • Materials available include: oak, cherry, maple, hickory, ash, walnut, bamboo, etc.

Sanding:

  • Our equipment is state-of-the-art with professional people operating it.
  • Our dust containment & vacuum system keeps cleanup to a minimum.

Stains:

  • Bucket brown or a custom mix
  • We have several colors of commercial grade oil based stains
  • Straight out of the can or mixed to meet your color specifications.

Finishes:

  • Our finish is commercial grade, whether it is our environment friendly water based or oil based polyurethane.

Sheens:

  • Stains, semi gloss or gloss available
  • Most sanding, staining and finishing jobs take 3-5 days, which you can walk on in 24-hours.


Phone:
(816) 761-4353

 

Home  |  Products  |  Services  |  Testimonials  |  Floor Care Instructions  















 Sign In